1. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 1 Shijia Li MEng. Candidate, Department of ECE, McGill University…
Share
Transcript
  • 1. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 1 Shijia Li MEng. Candidate, Department of ECE, McGill University Supervisor: Prof. Geza Joos Email: shijia.li@mail.mcgill.ca Wind Farm Reactive Power Coordination Scheme Using IEC 61850
  • 2. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 Outline IEC 61850 and GOOSE messaging Case study – Wind farm controller  Configuration  Tools  Results 2
  • 3. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 IEC 61850 Overview & Benefits  Substation Automation Systems (SAS)  Defines the communication between intelligent electronic devices (IEDs).  Benefits  Multi-vendor interoperability  Low cost (installation and commissioning)  Free configuration Source: Special report IEC 61850—ABB Group 3
  • 4. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 GOOSE Message  GOOSE message  Time-critical activities communication between IEDs  Multicasting  Publisher/subscriber mechanism Source: IEC 61850-7-1 4
  • 5. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 Publisher/Subscriber  SCL file  Substation Configuration Language  IED configurations and communications 5 OPAL-RT GOOSE message blocks
  • 6. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 Outline IEC 61850 and GOOSE messaging Case study – Wind farm controller  Configuration  Tools  Results 6
  • 7. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 System Configuration  Centralized wind farm control  Utility grid code:E.12-01  PCC voltage (±6%)  Implement IEC 61850 protocol  Communication between WTG and wind farm controller 7 System configuration
  • 8. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 Wind Farm Reactive Power Coordination  Centralized wind farm control  Voltage regulation at PCC  Q dispatch based on reactive power capability for each WTG  Send/receive information using IEC 61850 GOOSE  Q set points for each WTG  Q capability from each WTG 8 Wind farm reactive power coordination scheme
  • 9. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 Tools  Hardware  OPAL-RT simulator  Network switch, cables  Laptop  Software  Modeling • Matlab Simulink, RT-LAB  SCL file configuration • ICD designer, XML marker  Network protocol analyzer • Wireshark Real-time simulation setup for wind farm reactive power coordination scheme 9
  • 10. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 Real-Time Simulation Model Network Console WTG1 WTG2 WTG3 10 Console WTG1 WTG2 WTG3 Network
  • 11. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 Troubleshooting  Wireshark  Packet analyzer  Used to capture and analyze GOOSE packets  Decoding  Destination address  Data set  Data attribute  Data value Data set Data attributes and values 11
  • 12. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 Simulation Results 100 200 300 400 500 600 -0.4 -0.3 -0.2 100 200 300 400 500 600 -0.4 -0.3 -0.2 100 200 300 400 500 600 -0.4 -0.3 -0.2 Time (s)ReactivepoweratWTG(pu) WTG 1 WTG 2 WTG 3  Control mode  Unity power factor  Reactive power coordination 100 200 300 400 500 600 1 1.05 1.1 Time (s) RMSvoltageatPCC(pu) Unity Power Factor Voltage Control 12 RMS voltage at PCC (pu) Reactive power at WTG (pu)
  • 13. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 Conclusion and Future work  Conclusion  OPAL-RT simulators allow for the testing of IEC 61850 GOOSE messaging.  Wind farm control strategy successfully implemented employing IEC 61850 GOOSE messaging.  Future work  Agent-based decentralized controller  Other distributed energy resources 13
  • 14. The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 Q & A Thank you! 14
  • Related Search
    We Need Your Support
    Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

    Thanks to everyone for your continued support.

    No, Thanks